Case Studies

London Paddington – Rope Access Roof Repairs, MLG UK project photo

London Paddington – Rope Access Roof Repairs

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Kemble Station – Emergency Propping, MLG UK project photo

Kemble Station – Emergency Propping

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Chippenham Station – Canopy Reconstruction, MLG UK project photo

Chippenham Station – Canopy Reconstruction

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Cholsey Station – Emergency Platform Stabilisation, MLG UK project photo

Cholsey Station – Emergency Platform Stabilisation

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Exeter Signal Box – Bird Netting, MLG UK project photo

Exeter Signal Box – Bird Netting

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Filton Abbey Wood Station – Overbridge Resurfacing, MLG UK project photo

Filton Abbey Wood Station – Overbridge Resurfacing

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Brimscombe Crossing Box, Stroud – Heritage Refurbishment in Service, MLG UK project photo

Brimscombe Crossing Box, Stroud – Heritage Refurbishment in Service

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Bristol Temple Meads – Temporary Ticket Office (Design & Build), MLG UK

Bristol Temple Meads – Temporary Ticket Office (Design & Build)

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Cardiff Canton MDU – 25-Year Liquid Roof, Designed and Installed, MLG UK project photo

Cardiff Canton MDU – 25-Year Liquid Roof, Designed and Installed

The refurbishment of Warminster Station Bridge was undertaken to improve the aesthetic appeal, safety, and longevity of the structure.

Ready to Start Your Project?

Get in touch today for a consultation and quote. Emergency services available 24/7

Risqs-logo
safecontractor approved logo vector
SMAS Logo
ciras logo
Cyber Essentials Plus certification logo
Construction line Gold Logo
F-Gas Logo
nic eic logo
nfrc logo rgb
LRWA logo main colour
iso 9001 logo
iso 14001 logo