Original detail, remade to match

Grade II and Grade II* buildings repaired, restored and kept in use, including London Liverpool Street and Swindon stations.

Brought in before the method is fixed


We are usually appointed early, often at concept stage, to advise what the fabric will tolerate and which surveys it needs before anyone commits to a method. Then we deliver it, fabric repair, restoration, roofing, stonework and leadwork, plus the modern upgrades that have to sit inside a historic building without harming it. Where original detail can’t be bought we template it, machine it and remake it to match.

Our Heritage Services

repair
Listed-building refurbishment

Modern standards inside historic fabric, agreed with the conservation officer before work starts.

roof
Heritage roofing and leadwork

Slate, tile, lead and traditional detail, repaired or renewed to match what’s there.

Canopy, valance and structural timber restoration

Reconstruction and structural repair, including beam repair and sourcing and machining timber to original sizes.

timber
Replication: 3D scanning and prototyping

Original detail scanned, modelled and prototyped so the replacement matches before it’s made.

Why Choose MLG for Heritage Projects?

Survey and advice first

  • Appointed at concept stage to advise what the fabric will tolerate and which surveys it needs
  • Full condition surveys, with recommendations on what can be refurbished and what has to be remade
  • Moisture content monitored and recorded through the works

We prove it before it goes on the building

  • Removal techniques approved first, and components catalogued and stored to the heritage statement
  • Templates made and components re-machined to the original profile, or scanned and prototyped where a profile has to be reproduced
  • Sample components and full decoration sampling produced for comparison and sign-off before the rest follows

Buildings we've worked on

  • London Liverpool Street station: heritage daggerboard valance, delivered under both Railway Heritage and City of London heritage statements
  • Swindon station: listed canopy timbers surveyed, machined to match and replaced like for like, phased on a live station around overhead line isolations
  • The Barclays Bank building, Newport city centre: heritage roof finished in a lead-effect system approved to match the original
  • Grade II listed buildings brought back into working use

Recent Heritage Projects

London Paddington – Heritage Bridge Roof Overlay

A liquid roofing overlay installed directly above live rail infrastructure, for Taziker.

London Paddington – Rope Access Roof Repairs

Reactive roof repairs at Paddington by rope access, no scaffold, no disruption to the station below.

Newport – Heritage Simulated Lead Roof

A lead roof replaced with a Polyroof simulated lead finish, approved by the local heritage authority.

What our clients say

I’d like to take this opportunity to say a huge thank you for the work completed on the station overbridge. The quality has been excellent, and I really appreciate you going beyond the original scope by redecorating the steel columns on the span and the stairs, this has given the structure a much-improved overall finish. Delivering the works within the six-day blockade was a great achievement, and the improvements have made a noticeably long-awaited positive difference to the station. I have received nothing but positive feedback from the Station Team.


Alison Tarrant
Asset Manager (East), Great Western Railway

Just a short email to extend our thanks to your site team for the sterling work undertaken on the Cardiff Central Office Refurbishment scheme. Your staff were a credit to your company… Nothing was too much trouble, they all stringently followed our safety procedures and all had a positive, can-do attitude throughout the works. As you can see from the attached pics, it’s been some transformation!


Shaun Scannell
Works Coordination Manager, Balfour Beatty (Rail Services)

The MLG roofing team consistently combine technical expertise, reliability and genuine care for the client’s needs. Their attention to detail, proactive communication and commitment to quality make them a standout in the industry, whether it’s a minor repair or a full-scale replacement, they approach every project with professionalism and pride, and never drop their health and safety standards.


Lee Husband
Director, MAPP

I’ve engaged MLG for several large-scale roofing projects with varying challenges, and have always found them proactive and responsive. Projects are completed on time and on budget, and they’re always sensitive to the live nature of our buildings. I look forward to using them again.


Mark Essex
St Monica Trust

Well done to Andrew and the wider MLG team for all their hard work throughout the installation of the Valance. The Valance has changed the landscape of Exchange Square and is being appreciated by all.


Calmour Hill
Sub Agent, Infrastructure u{2013} Rail, Morgan Sindall

MLG are the building contractors responsible for the 10 East flood damage repair works. Both the end client and Clerk of Works were impressed with their efficiency and standard of workmanship, and equally impressed by their level of communication and organisation. As such, we have invited them back to campus to kindly provide a presentation to any interested parties concerned with building projects of varying magnitude.


Oliver Eades
Clerk of Works, University of Bath

From start to finish the team were a pleasure to work with, friendly, professional and clearly very experienced. The liquid-applied system was exactly what we needed and the finish is top-notch. The lads were respectful of the college environment, kept everything tidy and caused minimal disruption to staff and students. A brilliant job, we’d definitely recommend MLG.


Richard Huish College

So I wanted to write to you and personally thank you and your teams for the efforts over the weekend battling the elements with Storm Darragh. Please pass on my thanks to all those involved, I know it was a real team effort, and just shows what can be achieved when working together. Your support as always is really appreciated…


Adrian Freeman
Programme Director, Sisk

MLG has done a great job getting the Valance installed ahead of programme with over 95% of the works now completed.


Jack Cox
Project Manager, Infrastructure u{2013} Rail, Morgan Sindall

Just wanted to place on record that Jon was extremely helpful in turning these works around at very short notice and played a key role in helping us out of a difficult situation with NWR.


Ian Parrock
Works Delivery Manager, Sisk

Great, I will be on site. Cameron has just finished and has done a great job, as have all your team that were involved.


Oliver Richards
Regional Support Services Manager, Aspris

Thank you for the work on the tipping hall lines. In Viridor we have a scheme called Homesafe Innovation, where something is an improvement and other sites should be made aware of good progress.


Dean Hitchens
Operations Manager, Viridor

Listed building to work on?

Tell us the building, the listing and what the conservation officer has said, we'll survey it and set out a method.