Sites that can't
stop for us
Roofing, cladding, waterproofing and structural repair for Jaguar Land Rover, Viridor, Wessex Water and multi-unit industrial estates.
Roofing and cladding on working sites
Roof replacement, cladding, gutter and structural repair, and external works on sites that keep running. We price against your permit regime and shift pattern, so the programme you get is the one that can actually be delivered. Where a roof is leaking into production, we make it safe first and programme the rest after.
Our Industrial Services
Large-span roofing and cladding
Industrial roofs and envelopes repaired, overclad or replaced without stopping the plant.
Structural, concrete and resin repair
Structural repair and industrial resin systems, including in operational process areas.
Welfare, offices and operational areas
Offices, welfare and control areas refurbished inside a working site.
Yards, drainage and external works
Hardstanding, surfacing, drainage and water management around live operations.
Why Choose MLG for Industrial Projects?
Your plant keeps running
- Works taken in sections, at night or inside a planned shutdown
- Permits to work and isolations agreed before we mobilise
- Craneage, access and lay-down areas planned with your site team
Specified for industrial duty
- Systems chosen for the loading, traffic and chemistry of the building
- Approved installer for Polyroof, Westwood, Alumasc, Sika, Bauder and IKO
- ISO 9001, ISO 14001 and ISO 45001 certified
Estates we already work on
- Waterproofing and internal liquid repairs for Jaguar Land Rover at their Solihull plant
- Works inside a live energy-from-waste plant for Viridor
- Structural resin repairs to operational assets for Wessex Water
What our clients say
Planning a shutdown or a phased programme?
Tell us the shift pattern, the shutdown dates and what can't be interrupted, we'll build the programme to them.
