Parc Plaza Retail Park, Bridgend
Client: MAPP Building Consultancy
Project Overview
Parc Plaza Retail Park, Bridgend
3,000 m²
Service: Groundowrks & Civils
Sector: Industrial Buildings
- Approved Contractor: MLG UK Ltd
- Client: MAPP Building Consultancy
- Duration: 8 weeks
- Work Carried Out: Civils and groundworks, paving, tarmac, drainage design and installation, as principal contractor
Scope of Work
Comprehensive refurbishment of the car park at Parc Plaza Retail Park in Bridgend, covering both the design and the installation of new drainage. MLG acted as principal contractor. The work revitalised a 3,000 m² area and gave the facility a substantial upgrade.
- 3,000 m² of surface uplifted and relaid
- 200 m of new drainage designed and installed to improve water management
- Civils and groundworks, paving and tarmac
- MLG as principal contractor
- Delivered in phases: Phase 4 valued at £145,262 ex VAT
Systems installed
- Drainage: 200 m of new drainage installed
- Surface: Full uplift and relay across 3,000 m²
Challenges & Constraints
A live retail park
The car park serves a trading retail park, so it could not be taken out of use while it was refurbished.
Drainage, not surface
Drainage was the underlying problem rather than the surface, which meant the job had to be designed as well as built.
A resurface would fail
Relaying the surface on its own would have failed again, because the cause of the water problem would have stayed where it was.
Project Execution & Techniques
Design and installation
MLG took on the drainage design as well as the installation, so the cause was addressed rather than covered over.
200 m of drainage
200 metres of new drainage was designed and installed to improve water management across the site.
Uplifted and relaid
3,000 m² of surface was uplifted and relaid through civils, groundworks, paving and tarmac, rather than patch repaired.
Delivered in phases
The work was delivered in phases, with Phase 4 valued at £145,262 ex VAT.
Outcome & Long-Term Benefits
Water managed at source
The water problem was resolved at source rather than deferred to the next failure.
The park kept trading
Phasing meant the retail park stayed usable while the refurbishment went on around it.
Principal contractor throughout
MLG acted as principal contractor for both the drainage design and the delivery, so the client dealt with one party for the whole job.
A repeat client
MAPP Building Consultancy appear on five MLG projects.
Conclusion
The car park at Parc Plaza Retail Park in Bridgend needed more than a resurface. Drainage was the underlying problem, so relaying the top would only have bought time, the job needed designing before it could be built.
MLG acted as principal contractor for both, designing and installing 200 metres of new drainage and uplifting and relaying 3,000 m² of surface through civils, groundworks, paving and tarmac. The work was phased so the retail park stayed usable, with Phase 4 valued at £145,262 ex VAT. MAPP Building Consultancy appear on five MLG projects.
Ready to start your project?
Contact MLG UK today.