Sites that can't
stop for us

Roofing, cladding, waterproofing and structural repair for Jaguar Land Rover, Viridor, Wessex Water and multi-unit industrial estates.

Roofing and cladding on working sites


Roof replacement, cladding, gutter and structural repair, and external works on sites that keep running. We price against your permit regime and shift pattern, so the programme you get is the one that can actually be delivered. Where a roof is leaking into production, we make it safe first and programme the rest after.

Our Industrial Services

repair
Large-span roofing and cladding

Industrial roofs and envelopes repaired, overclad or replaced without stopping the plant.

roof
Structural, concrete and resin repair

Structural repair and industrial resin systems, including in operational process areas.

management
Welfare, offices and operational areas

Offices, welfare and control areas refurbished inside a working site.

Yards, drainage and external works

Hardstanding, surfacing, drainage and water management around live operations.

Why Choose MLG for Industrial Projects?

Your plant keeps running

  • Works taken in sections, at night or inside a planned shutdown
  • Permits to work and isolations agreed before we mobilise
  • Craneage, access and lay-down areas planned with your site team

Specified for industrial duty

  • Systems chosen for the loading, traffic and chemistry of the building
  • Approved installer for Polyroof, Westwood, Alumasc, Sika, Bauder and IKO
  • ISO 9001, ISO 14001 and ISO 45001 certified

Estates we already work on

  • Waterproofing and internal liquid repairs for Jaguar Land Rover at their Solihull plant
  • Works inside a live energy-from-waste plant for Viridor
  • Structural resin repairs to operational assets for Wessex Water

Recent Industrial Projects

Parc Plaza, Bridgend – Car Park Refurbishment

3,000 m² of retail park car park refurbished, with new drainage MLG designed as well as installed.

What our clients say

I’d like to take this opportunity to say a huge thank you for the work completed on the station overbridge. The quality has been excellent, and I really appreciate you going beyond the original scope by redecorating the steel columns on the span and the stairs, this has given the structure a much-improved overall finish. Delivering the works within the six-day blockade was a great achievement, and the improvements have made a noticeably long-awaited positive difference to the station. I have received nothing but positive feedback from the Station Team.


Alison Tarrant
Asset Manager (East), Great Western Railway

Just a short email to extend our thanks to your site team for the sterling work undertaken on the Cardiff Central Office Refurbishment scheme. Your staff were a credit to your company… Nothing was too much trouble, they all stringently followed our safety procedures and all had a positive, can-do attitude throughout the works. As you can see from the attached pics, it’s been some transformation!


Shaun Scannell
Works Coordination Manager, Balfour Beatty (Rail Services)

The MLG roofing team consistently combine technical expertise, reliability and genuine care for the client’s needs. Their attention to detail, proactive communication and commitment to quality make them a standout in the industry, whether it’s a minor repair or a full-scale replacement, they approach every project with professionalism and pride, and never drop their health and safety standards.


Lee Husband
Director, MAPP

I’ve engaged MLG for several large-scale roofing projects with varying challenges, and have always found them proactive and responsive. Projects are completed on time and on budget, and they’re always sensitive to the live nature of our buildings. I look forward to using them again.


Mark Essex
St Monica Trust

Well done to Andrew and the wider MLG team for all their hard work throughout the installation of the Valance. The Valance has changed the landscape of Exchange Square and is being appreciated by all.


Calmour Hill
Sub Agent, Infrastructure u{2013} Rail, Morgan Sindall

MLG are the building contractors responsible for the 10 East flood damage repair works. Both the end client and Clerk of Works were impressed with their efficiency and standard of workmanship, and equally impressed by their level of communication and organisation. As such, we have invited them back to campus to kindly provide a presentation to any interested parties concerned with building projects of varying magnitude.


Oliver Eades
Clerk of Works, University of Bath

From start to finish the team were a pleasure to work with, friendly, professional and clearly very experienced. The liquid-applied system was exactly what we needed and the finish is top-notch. The lads were respectful of the college environment, kept everything tidy and caused minimal disruption to staff and students. A brilliant job, we’d definitely recommend MLG.


Richard Huish College

So I wanted to write to you and personally thank you and your teams for the efforts over the weekend battling the elements with Storm Darragh. Please pass on my thanks to all those involved, I know it was a real team effort, and just shows what can be achieved when working together. Your support as always is really appreciated…


Adrian Freeman
Programme Director, Sisk

MLG has done a great job getting the Valance installed ahead of programme with over 95% of the works now completed.


Jack Cox
Project Manager, Infrastructure u{2013} Rail, Morgan Sindall

Just wanted to place on record that Jon was extremely helpful in turning these works around at very short notice and played a key role in helping us out of a difficult situation with NWR.


Ian Parrock
Works Delivery Manager, Sisk

Great, I will be on site. Cameron has just finished and has done a great job, as have all your team that were involved.


Oliver Richards
Regional Support Services Manager, Aspris

Thank you for the work on the tipping hall lines. In Viridor we have a scheme called Homesafe Innovation, where something is an improvement and other sites should be made aware of good progress.


Dean Hitchens
Operations Manager, Viridor

Planning a shutdown or a phased programme?

Tell us the shift pattern, the shutdown dates and what can't be interrupted, we'll build the programme to them.