We work while you keep trading

Refits, roofing, M&E and 24/7 reactive for Gaucho, Flight Club, Honest Burger and Travis Perkins, one unit or across an estate.

Every hour you're shut costs you


So we work the hours you’re not trading, and hand back on the date you’ve already advertised. Shopfronts, interiors, kitchens, washrooms, roofing and M&E, one unit or forty, one specification, one point of contact.

Our Retail & Leisure Services

shop
Reactive repairs and 24/7 call-out

Leaks, failures and make-safe, on one site or across an estate, with the permanent repair programmed after.

restaurant
Store and unit refits

Trading floors, fixtures and finishes, phased around opening hours or turned around inside a closure.

facade
Bars, pubs and restaurants

Front and back of house, including kitchens and washrooms, reopened on the date agreed.

toilet
Roofing, yards and external works

Roof repair and replacement worked from above so the floor below keeps trading, plus yard reconfiguration, resurfacing and car parks.

Why Choose MLG for Retail & Leisure?

Working around your customers

  • Night and closure-window working, screened and cleaned before you open
  • Deliveries and waste routed through your service access, at hours you agree
  • The engineers who fitted your site are the ones who come back to fix it

One standard across the estate

  • A single specification held across a rolling programme
  • The same team returning, so nothing is relearned site to site
  • Every job on one system, so you can see what has been done at every site

Estates we already work on

  • Rolling works for Mitchells & Butlers, Gaucho, Honest Burger and Flight Club
  • Reactive, refits and yard works for Travis Perkins
  • Pubs and inns for RedCat and The Coaching Inn Group
  • Shop estates for Ladbrokes and Coral
  • Roofing and building works for Tesco and Toolstation

Recent Retail & Leisure Projects

Tesco Express, Cookley – Roof Refurbishment

Every slate replaced, new leadwork throughout, and the gutters relined in Westwood liquid.

Tesco, Blandford Forum – Reactive Leak to 600 lm Gutter Lining

A reactive leak call-out that became 600 linear metres of permanent gutter lining, patched, diverted, specified, quoted and installed by MLG.

Roxy Lanes, Union Street, Bristol – Roof Replacement

1,700 m² of failing single-ply replaced over a live leisure venue, with a substantial thermal upgrade.

What our clients say

I’d like to take this opportunity to say a huge thank you for the work completed on the station overbridge. The quality has been excellent, and I really appreciate you going beyond the original scope by redecorating the steel columns on the span and the stairs, this has given the structure a much-improved overall finish. Delivering the works within the six-day blockade was a great achievement, and the improvements have made a noticeably long-awaited positive difference to the station. I have received nothing but positive feedback from the Station Team.


Alison Tarrant
Asset Manager (East), Great Western Railway

Just a short email to extend our thanks to your site team for the sterling work undertaken on the Cardiff Central Office Refurbishment scheme. Your staff were a credit to your company… Nothing was too much trouble, they all stringently followed our safety procedures and all had a positive, can-do attitude throughout the works. As you can see from the attached pics, it’s been some transformation!


Shaun Scannell
Works Coordination Manager, Balfour Beatty (Rail Services)

The MLG roofing team consistently combine technical expertise, reliability and genuine care for the client’s needs. Their attention to detail, proactive communication and commitment to quality make them a standout in the industry, whether it’s a minor repair or a full-scale replacement, they approach every project with professionalism and pride, and never drop their health and safety standards.


Lee Husband
Director, MAPP

I’ve engaged MLG for several large-scale roofing projects with varying challenges, and have always found them proactive and responsive. Projects are completed on time and on budget, and they’re always sensitive to the live nature of our buildings. I look forward to using them again.


Mark Essex
St Monica Trust

Well done to Andrew and the wider MLG team for all their hard work throughout the installation of the Valance. The Valance has changed the landscape of Exchange Square and is being appreciated by all.


Calmour Hill
Sub Agent, Infrastructure u{2013} Rail, Morgan Sindall

MLG are the building contractors responsible for the 10 East flood damage repair works. Both the end client and Clerk of Works were impressed with their efficiency and standard of workmanship, and equally impressed by their level of communication and organisation. As such, we have invited them back to campus to kindly provide a presentation to any interested parties concerned with building projects of varying magnitude.


Oliver Eades
Clerk of Works, University of Bath

From start to finish the team were a pleasure to work with, friendly, professional and clearly very experienced. The liquid-applied system was exactly what we needed and the finish is top-notch. The lads were respectful of the college environment, kept everything tidy and caused minimal disruption to staff and students. A brilliant job, we’d definitely recommend MLG.


Richard Huish College

So I wanted to write to you and personally thank you and your teams for the efforts over the weekend battling the elements with Storm Darragh. Please pass on my thanks to all those involved, I know it was a real team effort, and just shows what can be achieved when working together. Your support as always is really appreciated…


Adrian Freeman
Programme Director, Sisk

MLG has done a great job getting the Valance installed ahead of programme with over 95% of the works now completed.


Jack Cox
Project Manager, Infrastructure u{2013} Rail, Morgan Sindall

Just wanted to place on record that Jon was extremely helpful in turning these works around at very short notice and played a key role in helping us out of a difficult situation with NWR.


Ian Parrock
Works Delivery Manager, Sisk

Great, I will be on site. Cameron has just finished and has done a great job, as have all your team that were involved.


Oliver Richards
Regional Support Services Manager, Aspris

Thank you for the work on the tipping hall lines. In Viridor we have a scheme called Homesafe Innovation, where something is an improvement and other sites should be made aware of good progress.


Dean Hitchens
Operations Manager, Viridor

One site, or a rolling programme?

Tell us the sites and the closure windows and we'll come back with a programme.