Offices fitted out before your people arrive, or refurbished around them

Fit-out, refurbishment and common parts for Network Rail, MAPP, Trident Building Consultancy and Create Real Estate.

One contractor for the whole floor


Design, partitions, M&E, decoration, washrooms and flooring, delivered by our own staff. We work in empty buildings and occupied ones, if your tenants are still in, we phase around them. One number to ring, a programme you can hold us to, and the same team still around when something needs fixing in two years.

Our Office Services

Fit-out of new and vacant space

Full fit-out from shell or landlord finish, handed over ready to occupy on the date agreed.

office
Occupied-floor refurbishment

Floor-by-floor and wing-by-wing programmes, phased so the rest of the building carries on.

Reception and common parts

Entrances, lift lobbies, corridors, washrooms and shared spaces, kept in use while they’re worked on.

management
Office M&E, lighting and comms

Power, lighting, data, heating and cooling installed and switched over to a plan agreed with you.

Why Choose MLG for Office Projects?

Empty space: programme and specification

  • Design and specification settled before we mobilise
  • Long-lead items ordered early, so handover isn’t waiting on a delivery
  • Commissioned, snagged and handed over ready to occupy

Occupied space: we plan around your day

  • Phasing agreed and issued before we start
  • Evening, weekend and closure-window working where the day can’t take it
  • You get the dates and the disruption early enough to pass to your tenants

Estates we already work on

  • Landlord alterations and tenant fit-outs for MAPP and Trident Building Consultancy
  • Office fit-outs for Network Rail and alterations for Great Western Railway
  • Historic buildings converted into modern workspace for Create Real Estate

Recent Office Projects

Upper Borough Walls, Bath – Automatic Entrance Replacement

A life-expired main entrance replaced with a new automatic door system in one working day.

Semaphore House, Cardiff Central – Cabin Refurbishment

£150k refurbishment of a disused cabin at Cardiff Central, bringing it back into use so station staff had somewhere to work.

Spectrum House, Swindon – Grade II Listed Roof Refurbishment

25,000 m² of roof to a Grade II listed Norman Foster building. Highly Commended at the LRWA Awards 2025 and an NFRC finalist.

What our clients say

I’d like to take this opportunity to say a huge thank you for the work completed on the station overbridge. The quality has been excellent, and I really appreciate you going beyond the original scope by redecorating the steel columns on the span and the stairs, this has given the structure a much-improved overall finish. Delivering the works within the six-day blockade was a great achievement, and the improvements have made a noticeably long-awaited positive difference to the station. I have received nothing but positive feedback from the Station Team.


Alison Tarrant
Asset Manager (East), Great Western Railway

Just a short email to extend our thanks to your site team for the sterling work undertaken on the Cardiff Central Office Refurbishment scheme. Your staff were a credit to your company… Nothing was too much trouble, they all stringently followed our safety procedures and all had a positive, can-do attitude throughout the works. As you can see from the attached pics, it’s been some transformation!


Shaun Scannell
Works Coordination Manager, Balfour Beatty (Rail Services)

The MLG roofing team consistently combine technical expertise, reliability and genuine care for the client’s needs. Their attention to detail, proactive communication and commitment to quality make them a standout in the industry, whether it’s a minor repair or a full-scale replacement, they approach every project with professionalism and pride, and never drop their health and safety standards.


Lee Husband
Director, MAPP

I’ve engaged MLG for several large-scale roofing projects with varying challenges, and have always found them proactive and responsive. Projects are completed on time and on budget, and they’re always sensitive to the live nature of our buildings. I look forward to using them again.


Mark Essex
St Monica Trust

Well done to Andrew and the wider MLG team for all their hard work throughout the installation of the Valance. The Valance has changed the landscape of Exchange Square and is being appreciated by all.


Calmour Hill
Sub Agent, Infrastructure u{2013} Rail, Morgan Sindall

MLG are the building contractors responsible for the 10 East flood damage repair works. Both the end client and Clerk of Works were impressed with their efficiency and standard of workmanship, and equally impressed by their level of communication and organisation. As such, we have invited them back to campus to kindly provide a presentation to any interested parties concerned with building projects of varying magnitude.


Oliver Eades
Clerk of Works, University of Bath

From start to finish the team were a pleasure to work with, friendly, professional and clearly very experienced. The liquid-applied system was exactly what we needed and the finish is top-notch. The lads were respectful of the college environment, kept everything tidy and caused minimal disruption to staff and students. A brilliant job, we’d definitely recommend MLG.


Richard Huish College

So I wanted to write to you and personally thank you and your teams for the efforts over the weekend battling the elements with Storm Darragh. Please pass on my thanks to all those involved, I know it was a real team effort, and just shows what can be achieved when working together. Your support as always is really appreciated…


Adrian Freeman
Programme Director, Sisk

MLG has done a great job getting the Valance installed ahead of programme with over 95% of the works now completed.


Jack Cox
Project Manager, Infrastructure u{2013} Rail, Morgan Sindall

Just wanted to place on record that Jon was extremely helpful in turning these works around at very short notice and played a key role in helping us out of a difficult situation with NWR.


Ian Parrock
Works Delivery Manager, Sisk

Great, I will be on site. Cameron has just finished and has done a great job, as have all your team that were involved.


Oliver Richards
Regional Support Services Manager, Aspris

Thank you for the work on the tipping hall lines. In Viridor we have a scheme called Homesafe Innovation, where something is an improvement and other sites should be made aware of good progress.


Dean Hitchens
Operations Manager, Viridor

Floors to fit out or refurbish?

Tell us the floors, the dates and whether anyone's still in the building, the programme starts there.