Upper Borough Walls, Bath
Client: MAPP Building Consultancy
Project Overview
Upper Borough Walls, Bath
One working day
Service: Commercial & Retail Refurbishment
Sector: Offices
- Approved Contractor: MLG UK Ltd
- System Installed: Record automatic sliding door
- Client: MAPP Building Consultancy
- Duration: One working day
- Work Carried Out: Aluminium automatic door installation, keypad access, electrical coordination
Scope of Work
Replacement of the life-expired main entrance door at the Upper Borough Walls building in Bath with a new aluminium automatic door system with keypad access, improving both security and ease of entry for building users.
- Removal of the existing main entrance door and frame
- Installation of a new aluminium automatic door with integrated keypad entry
- Coordination of electrical connections and finishing works
- Full completion within a single working day to maintain overnight building security
Systems installed
- Automatic door: Automatic sliding door and header: 3575 × 2965 aluminium screen, five fixed fields plus sliding leaf (Record)
- Finish: Powder coated RAL 7016 Matt, Anthracite Grey
- Glazing: 10.8mm laminated safety glass
- Access control: Euro hook locks, keyed alike, 1400mm keypad entry
Challenges & Constraints
An existing arched opening
The arched doorway meant the new unit had to be measured and manufactured to fine tolerances rather than ordered to a standard size.
No remeasure possible
Fabrication lead times were long, so there was no opportunity to remeasure and reorder if the survey was out.
Secure by nightfall
The building fronts a busy high street in Bath and the entrance could not be left open overnight.
Project Execution & Techniques
A single-day sequence
The whole installation was planned as one working day rather than a phased job, with every trade coordinated to that sequence.
Old entrance removed
The life-expired main entrance door and frame were taken out ready for the new screen.
Record screen installed
A Record automatic sliding door and header went in as a 3575 × 2965 aluminium screen with five fixed fields plus a sliding leaf, powder coated RAL 7016 Matt Anthracite Grey and glazed in 10.8mm laminated safety glass.
Access control connected
Euro hook locks keyed alike and 1400mm keypad entry were fitted, with the electrical connections and finishing works completed in the same day.
Outcome & Long-Term Benefits
Working the same day
The new door was installed, tested and fully operational within one working day.
Never left insecure
The building kept its security throughout, with no overnight exposure of the main entrance.
Easier, controlled entry
An automatic door with integrated keypad access improved both security and ease of entry for building users.
Public safety managed
The work was carried out on a busy high street with public safety managed for the duration.
Conclusion
The main entrance at Upper Borough Walls was life-expired and sat in an existing arched opening on a busy Bath high street. That combination sets the difficulty: fine tolerances and long fabrication lead times on one side, a building that cannot be left open overnight on the other.
MLG measured and ordered to fit the arch, then installed the Record automatic sliding screen, keypad access and electrical connections inside a single working day. The door was tested and operational before the building closed, the entrance was never left insecure, and MAPP Building Consultancy recorded the client as very satisfied with the result.
Ready to start your project?
Contact MLG UK today.