Crescent Centre, Bristol

Client: G & H Maintenance, for CEG

Project Overview

Crescent Centre, Bristol

£1,395 ex VAT

Service: Commercial & Retail Refurbishment, Facilities Management

Sector: Offices

  • Approved Contractor: MLG UK Ltd
  • Client: G & H Maintenance, for CEG
  • Duration: One and a half days, two operatives
  • Work Carried Out: Specialist installation, lifting and securing

Scope of Work

Not every facilities request is a building. MLG installed a replica giraffe at the Crescent Centre in Bristol for G & H Maintenance, on behalf of CEG.

  • Final verification of the designated installation location; area cleared and made safe
  • Positioning and securing of the replica giraffe using appropriate lifting and securing equipment
  • Alignment and levelling to ensure stability and aesthetic placement
  • Two operatives on site for one full day and a half day
  • Site clean-up, debris removal and final visual inspection to confirm safe installation

Systems installed

  • Artwork: Replica giraffe

Challenges & Constraints

01
An unusual object

A replica giraffe is not a standard facilities item, so there was no off-the-shelf way of lifting it, positioning it and holding it in place.

02
A live office site

The installation was at the Crescent Centre, a working office building, so the area had to be cleared and made safe before anything was moved.

03
Stable and well placed

The giraffe had to be both structurally secure and correctly placed, so alignment and levelling mattered as much as the fixing.

Project Execution & Techniques

Location verified first

The designated installation position was confirmed on site before work started, and the area around it was cleared and made safe.

Lifted and secured

The giraffe was positioned and secured using appropriate lifting and securing equipment rather than manhandled into place.

Aligned and levelled

It was aligned and levelled for stability and for the way it sits in the space, not simply stood upright.

Day and a half

Two operatives were on site for one full day and a half day, finishing with site clean-up and debris removal.

Outcome & Long-Term Benefits

Installed and secure

The replica giraffe was positioned, levelled and secured in the location the client had designated.

Checked on completion

A final visual inspection was carried out to confirm the installation before the site was handed back.

Site left clean

Debris was removed and the area cleared, so the office was returned in the condition it was found.

The same discipline

The job was run with the same discipline MLG applies to a £1m contract, verified location, correct equipment, levelling, inspection.

Conclusion

Not every facilities request is a building. G & H Maintenance, acting for CEG, needed a replica giraffe installed at the Crescent Centre in Bristol, and it still had to be lifted properly, held properly and left safe in an occupied office.

MLG treated it as an installation with a method: location verified, area cleared, correct lifting equipment, levelled for stability and appearance, inspected on completion and the site left clean. A £1,395 job, delivered the same way as a £1m one. It is a fair illustration of the range of what MLG’s FM division gets asked to do.

Ready to start your project?

Contact MLG UK today.