Safer high-rise
homes

Façade remediation, balconies and communal works, delivered as Principal Contractor in buildings that stay occupied.

We can carry the Principal Contractor duty


Cladding replacement, fire stopping, balcony and structural repair, and communal works. Where you appoint us as Principal Contractor on a higher-risk building we carry the dutyholder responsibilities, with named individuals assessed against the competence standards. Our own Resident Liaison Officers knock on doors, answer questions and keep vulnerable residents informed while it happens.

Our High-Rise Services

facade
Façade fire remediation and recladding

Full remediation and recladding, worked from a competent appraisal of the external wall and a fire strategy owned by a qualified fire engineer.

repair
Balcony, structural and concrete repair

Structural and concrete repair, waterproofing and finishes to balconies and occupied blocks, including warranted systems.

Communal areas, entrances and stairs

Shared spaces refurbished while residents keep using them.

roof
Fire doors, surveys and compartmentation

Fire door surveys and replacement, plus fire stopping and compartmentation to flat entrances, risers and communal routes.

Why Choose MLG for High-Rise Projects?

Residents stay safe at home

  • Means of escape maintained throughout the works
  • Interim fire-safety measures coordinated with the responsible person
  • Dedicated Resident Liaison Officers, with vulnerable residents identified and kept informed

Building Safety Act competence

  • Principal Contractor duty carried on higher-risk building schemes
  • Competence to BS 8670-1, with named individuals assessed under PAS 8672
  • Golden Thread maintained digitally by an in-house quality team, Gateway 2 through to handover
  • Our Professional Indemnity cover includes fire-safety work, including cladding activities

Schemes we've delivered

  • Sixteen buildings remediated or in delivery
  • Remediation for developers, registered providers and housing associations
  • Balcony refurbishment for national building consultancies, with warranted systems

Recent High-rise Projects

Vision 17, Westbury – Balcony Refurbishment

Failing single-ply on a block of flats replaced, and balconies given the durable finish the client asked for.

Overstone Court, Cardiff Bay – Five-Block Facade Remediation

Principal Contractor on a £2.59m facade remediation. Five blocks, HPL stripped from twelve storeys, and residents in their homes throughout.

Oatley House, Bristol – Grade II Listed Roof Refurbishment

650 m² of failing asphalt replaced over an occupied Grade II listed care home of 70 apartments. Highly Commended at the LRWA Awards 2026.

What our clients say

I’d like to take this opportunity to say a huge thank you for the work completed on the station overbridge. The quality has been excellent, and I really appreciate you going beyond the original scope by redecorating the steel columns on the span and the stairs, this has given the structure a much-improved overall finish. Delivering the works within the six-day blockade was a great achievement, and the improvements have made a noticeably long-awaited positive difference to the station. I have received nothing but positive feedback from the Station Team.


Alison Tarrant
Asset Manager (East), Great Western Railway

Just a short email to extend our thanks to your site team for the sterling work undertaken on the Cardiff Central Office Refurbishment scheme. Your staff were a credit to your company… Nothing was too much trouble, they all stringently followed our safety procedures and all had a positive, can-do attitude throughout the works. As you can see from the attached pics, it’s been some transformation!


Shaun Scannell
Works Coordination Manager, Balfour Beatty (Rail Services)

The MLG roofing team consistently combine technical expertise, reliability and genuine care for the client’s needs. Their attention to detail, proactive communication and commitment to quality make them a standout in the industry, whether it’s a minor repair or a full-scale replacement, they approach every project with professionalism and pride, and never drop their health and safety standards.


Lee Husband
Director, MAPP

I’ve engaged MLG for several large-scale roofing projects with varying challenges, and have always found them proactive and responsive. Projects are completed on time and on budget, and they’re always sensitive to the live nature of our buildings. I look forward to using them again.


Mark Essex
St Monica Trust

Well done to Andrew and the wider MLG team for all their hard work throughout the installation of the Valance. The Valance has changed the landscape of Exchange Square and is being appreciated by all.


Calmour Hill
Sub Agent, Infrastructure u{2013} Rail, Morgan Sindall

MLG are the building contractors responsible for the 10 East flood damage repair works. Both the end client and Clerk of Works were impressed with their efficiency and standard of workmanship, and equally impressed by their level of communication and organisation. As such, we have invited them back to campus to kindly provide a presentation to any interested parties concerned with building projects of varying magnitude.


Oliver Eades
Clerk of Works, University of Bath

From start to finish the team were a pleasure to work with, friendly, professional and clearly very experienced. The liquid-applied system was exactly what we needed and the finish is top-notch. The lads were respectful of the college environment, kept everything tidy and caused minimal disruption to staff and students. A brilliant job, we’d definitely recommend MLG.


Richard Huish College

So I wanted to write to you and personally thank you and your teams for the efforts over the weekend battling the elements with Storm Darragh. Please pass on my thanks to all those involved, I know it was a real team effort, and just shows what can be achieved when working together. Your support as always is really appreciated…


Adrian Freeman
Programme Director, Sisk

MLG has done a great job getting the Valance installed ahead of programme with over 95% of the works now completed.


Jack Cox
Project Manager, Infrastructure u{2013} Rail, Morgan Sindall

Just wanted to place on record that Jon was extremely helpful in turning these works around at very short notice and played a key role in helping us out of a difficult situation with NWR.


Ian Parrock
Works Delivery Manager, Sisk

Great, I will be on site. Cameron has just finished and has done a great job, as have all your team that were involved.


Oliver Richards
Regional Support Services Manager, Aspris

Thank you for the work on the tipping hall lines. In Viridor we have a scheme called Homesafe Innovation, where something is an improvement and other sites should be made aware of good progress.


Dean Hitchens
Operations Manager, Viridor

Remediation scheme to deliver?

Tell us the building, the survey position and where you are with the regulator, the earlier we're involved, the better the scheme runs.